Koerner has more than 25 years of experience and research, worldwide patents, and customers in 50 countries worldwide.
The OBO Bettermann group of companies built a production hall with 30,000 m2 of usable space on a site that covered approx. 50,000 m2. It was designed in accordance with the latest economic and energetic perspectives.
A hot dip galvanising plant was to be integrated into the optimum material flow in this new competence centre for metals.
KVK Koerner was selected as the competent partner for pre-treatment. Together with OBO Bettermann, all logistics and environmentally relevant aspects were incorporated into the preliminary planning.
The encapsulated concept of a pre-treatment line based on the KVK system was the prerequisite for operating a hot dip galvanising plant that is located in the same hall as the other production machines.
The tank size of 7.5 x 1.4 x 3.5 m is specifically matched to their own products. The KVK module for automatic pickling optimisation is implemented in the pickling plant for optimum pickling management.